FAQ

Home / FAQ

No. We offer two piece cubicles that can be dismantled to fit through doorways or narrow hallways allowing you to enjoy the benefits of a large shower cubicle.

 

  • In product range, Choose your Shower
  • Fill Required fields (Standard or Raised Base + Model if applicable)
  • Add any Options & Extras you require by using the drop boxes
  • Click ‘Add to Quote’
  • Fill Submission Form including any questions you may have
  • Click “Get your Quote in 60 Seconds”

All of our showers are manufactured in our factory in Redcliffe, Queensland.

We accept most Credit Cards and Direct Debit

Yes. 12 Month Warranty against Faulty Workmanship and Materials for all showers. All accessaries are covered by original manufactures warrenty

Yes we can arrange all deliveries.

Yes. We can assist you with safe loading. Preferably the cubicle will lay down on its back on your trailer or ute. We advise you bring the neccesary ropes/ratchet straps and padding such as blankets and towels.

Yes, please feel free. Although we don’t carry a lot of stock, there are always showers here that are awaiting pickup/delivery.

Majority of our cubicles have a fixing flange, for those that don’t, you will be required to use battens. Fitting guide included with purchase.

Yes, we recommend it as it is apart of the Building Code of Australia and Australian Standards.

Shower Cubicle

Standard Base or Raised Base?

VIEW MORE arrow